Message type: E = Error
Message class: /SAPAPO/CURTO -
Message number: 023
Message text: Operation &1, activity &2: Minimum interval > Maximum interval
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CURTO023
- Operation &1, activity &2: Minimum interval > Maximum interval ?The SAP error message /SAPAPO/CURTO023 typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is a conflict in the scheduling of operations within a production or planning process. The message indicates that for a specific operation (&1) and activity (&2), the defined minimum interval is greater than the maximum interval. This can lead to scheduling conflicts and prevent the system from generating a feasible plan.
Cause:
Configuration Issues: The minimum and maximum intervals for the operation or activity may have been incorrectly configured in the system. Data Entry Errors: There may be incorrect data entries in the master data or planning data that define the intervals for the operations. Resource Constraints: The resources assigned to the operation may have constraints that lead to this conflict. Planning Parameters: The planning parameters set for the operation may not align with the defined intervals.
Solution: Check Configuration: Review the configuration settings for the operation and
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/CURTO022
Component assignment &1 to dynamic setup activities &2 &3 not allowed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CURTO021
Variable duration and capacity reqmts: resource &1, operation &2, act. &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CURTO024
Operation &1, activity &2: Invalid activity type
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CURTO025
Invalid input/output indicator for material &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.