How To Fix /SAPAPO/CURTO021 - Variable duration and capacity reqmts: resource &1, operation &2, act. &3


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CURTO -

  • Message number: 021

  • Message text: Variable duration and capacity reqmts: resource &1, operation &2, act. &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CURTO021 - Variable duration and capacity reqmts: resource &1, operation &2, act. &3 ?

    The SAP error message /SAPAPO/CURTO021 typically relates to issues with variable duration and capacity requirements in the Advanced Planning and Optimization (APO) module of SAP. This error indicates that there is a problem with the resource allocation for a specific operation in a production process.

    Cause:

    The error message /SAPAPO/CURTO021 can occur due to several reasons:

    1. Resource Capacity Issues: The resource specified in the error message may not have enough capacity to handle the requirements of the operation. This can happen if the resource is already allocated to other operations or if the capacity settings are not configured correctly.

    2. Variable Duration Settings: The operation may have variable duration settings that are not compatible with the resource's capacity. If the duration of the operation exceeds the available capacity, this error can be triggered.

    3. Incorrect Master Data: There may be inconsistencies or errors in the master data related to the resource, operation, or activity. This includes incorrect settings in the resource profile, operation details, or production version.

    4. Scheduling Conflicts: If there are scheduling conflicts with other operations or resources, it can lead to this error. This is particularly common in complex production environments with multiple overlapping operations.

    Solution:

    To resolve the error /SAPAPO/CURTO021, you can take the following steps:

    1. Check Resource Capacity:

      • Review the capacity settings for the resource specified in the error message. Ensure that the resource has enough available capacity to handle the operation's requirements.
      • If necessary, adjust the capacity or reallocate resources to free up capacity.
    2. Review Variable Duration Settings:

      • Check the variable duration settings for the operation. Ensure that the duration is set correctly and is compatible with the resource's capacity.
      • If the duration is too long, consider optimizing the operation or breaking it down into smaller tasks.
    3. Validate Master Data:

      • Verify the master data for the resource, operation, and activity. Ensure that all settings are correct and consistent.
      • Make any necessary adjustments to the master data to resolve inconsistencies.
    4. Analyze Scheduling Conflicts:

      • Review the scheduling of other operations that may be conflicting with the operation in question. Adjust the scheduling to avoid overlaps that could lead to capacity issues.
    5. Use APO Planning Tools:

      • Utilize APO planning tools to simulate and analyze the production schedule. This can help identify potential issues before they cause errors.
    6. Consult Documentation:

      • Refer to SAP documentation or support notes related to this error message for additional insights and troubleshooting steps.

    Related Information:

    • Transaction Codes: You may want to use transaction codes like /SAPAPO/SDP94 (for planning board) or /SAPAPO/MC90 (for capacity planning) to analyze the situation further.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance.
    • Support: If the issue persists after trying the above solutions, consider reaching out to SAP support for further assistance.

    By following these steps, you should be able to identify and resolve the underlying issues causing the /SAPAPO/CURTO021 error message.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author