How To Fix /SAPAPO/CURTO018 - Variable bucket consumption: resource &1, operation &2, activity &3 < &4


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CURTO -

  • Message number: 018

  • Message text: Variable bucket consumption: resource &1, operation &2, activity &3 < &4

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CURTO018 - Variable bucket consumption: resource &1, operation &2, activity &3 < &4 ?

    The SAP error message /SAPAPO/CURTO018 is related to the consumption of variable buckets in the Advanced Planning and Optimization (APO) module of SAP. This error typically occurs when there is an issue with the consumption of resources in a production planning scenario, particularly when dealing with variable bucket planning.

    Cause:

    The error message indicates that there is a problem with the consumption of a resource for a specific operation and activity. The message format suggests that the consumption of the resource exceeds the available capacity or is not aligned with the defined planning parameters. The specific components of the error message are:

    • Resource &1: The resource that is being consumed.
    • Operation &2: The operation that is being executed.
    • Activity &3: The activity related to the operation.
    • &4: The threshold or limit that is being exceeded.

    Common causes for this error include:

    1. Capacity Constraints: The resource may have insufficient capacity to handle the planned activities.
    2. Incorrect Planning Parameters: The planning parameters for the resource or operation may not be set correctly.
    3. Overlapping Activities: There may be overlapping activities that are consuming the same resource beyond its available capacity.
    4. Incorrect Bucket Settings: The variable bucket settings may not be configured properly, leading to incorrect consumption calculations.

    Solution:

    To resolve the error, you can take the following steps:

    1. Check Resource Capacity: Verify the capacity settings for the resource in question. Ensure that the resource has enough capacity to handle the planned operations and activities.

    2. Review Planning Parameters: Check the planning parameters for the resource and operation. Ensure that they are set correctly and align with the production requirements.

    3. Analyze Overlapping Activities: Look for any overlapping activities that may be consuming the same resource. Adjust the scheduling of these activities to avoid conflicts.

    4. Adjust Variable Bucket Settings: Review the variable bucket settings in the planning book or the relevant configuration. Ensure that they are set up correctly to allow for proper consumption calculations.

    5. Check for Errors in Master Data: Ensure that the master data for the resource, operation, and activity is accurate and complete. Any discrepancies can lead to consumption issues.

    6. Run Planning Runs: After making adjustments, run the planning runs again to see if the error persists. Monitor the results to ensure that the changes have resolved the issue.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like /SAPAPO/MC62 (for planning book) or /SAPAPO/SCM1 (for checking the supply chain) to analyze the planning data.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance on troubleshooting.
    • Documentation: Refer to the SAP APO documentation for detailed information on resource planning, variable buckets, and capacity management.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant with expertise in SAP APO for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant