Message type: E = Error
Message class: /SAPAPO/CULL1 -
Message number: 033
Message text: Explosion date &1 outside of validity period (&2, &3)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CULL1033
- Explosion date &1 outside of validity period (&2, &3) ?The SAP error message /SAPAPO/CULL1033 Explosion date &1 outside of validity period (&2, &3) typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is an issue with the validity period of a product or a planning object. This error indicates that the explosion date (the date when the system is trying to explode the bill of materials or perform a planning operation) is outside the defined validity period for the relevant master data.
Cause: Invalid Explosion Date: The explosion date specified in the planning run is outside the validity period of the product or the bill of materials (BOM). Master Data Configuration: The master data (like BOM, routing, or product master) may not be correctly configured with the appropriate validity dates. Planning Horizon: The planning horizon set in the system may not cover the explosion date being used.
Solution: Check Validity Period: Review the validity period of the product master data,
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/CULL1032
Order &1 will be deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/PM0/ABP_BIZPRC110
Processing level must be chosen
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CULL1034
You cannot use SAP_CHECK_01 for configuration-relevant products
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CULL1035
The configuration relevance for the master output is inconsistent
What causes this issue? The production data structure for material &v1&, plant &v2&, production version &v3& is inconsistent ...
Click on this link to search all SAP messages.