Do you have any question about this error?
Message type: E = Error
Message class: /PM0/ABP_BIZPRC -
Message number: 110
Message text: Processing level must be chosen
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABP_BIZPRC110
- Processing level must be chosen ?The SAP error message
/PM0/ABP_BIZPRC110 Processing level must be chosen
typically occurs in the context of business process management or project management within SAP. This error indicates that a required processing level has not been selected or defined in the system, which is necessary for the operation you are trying to perform.Cause:
- Missing Configuration: The processing level may not be configured in the system. This could be due to incomplete setup in the relevant customizing settings.
- User Input Error: The user may have failed to select a processing level in the transaction or screen where it is required.
- Authorization Issues: Sometimes, the user may not have the necessary authorizations to view or select the processing levels.
Solution:
- Select Processing Level: Ensure that you are selecting a processing level in the relevant screen. Look for dropdowns or selection fields where you can specify the processing level.
- Check Configuration: If you are an administrator or have access to configuration settings, check the relevant customizing settings in the SAP system:
- Go to the SPRO transaction (SAP Project Reference Object) and navigate to the relevant area for business process management or project management.
- Ensure that the processing levels are defined and configured correctly.
- User Training: If the issue is due to user error, provide training or documentation to users on how to properly select processing levels in the system.
- Authorization Check: Verify that the user has the necessary authorizations to access and select processing levels. This can be done by checking the user roles and authorizations in the user management area.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth assistance.
Get instant SAP help. Start your 7-day free trial now.
/PM0/ABP_BIZPRC109
No object found for the next business transaction
What causes this issue? The system could not find any object to be processed for the next <DS:GLOS.05B237D9EF39F74ABB78492B40B3BA51>business tr...
/PM0/ABP_BIZPRC108
Business transaction sequence was cancelled
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CULL1032
Order &1 will be deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CULL1033
Explosion date &1 outside of validity period (&2, &3)
What causes this issue? The production data structure is valid from &v2& to &v3&. The explosion of the production data structure is c...
Click on this link to search all SAP messages.