Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CTM1 -
Message number: 384
Message text: Validity end date for source of supply &1 is larger than standard value
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CTM1384
- Validity end date for source of supply &1 is larger than standard value ?The SAP error message
/SAPAPO/CTM1384
indicates that the validity end date for a source of supply is larger than the standard value defined in the system. This error typically occurs in the context of Advanced Planning and Optimization (APO) when working with the Capacity Planning or Supply Network Planning (SNP) modules.Cause:
- Validity Date Configuration: The source of supply (like a vendor or production location) has a validity end date that exceeds the maximum allowed date set in the system configuration.
- Master Data Issues: The master data for the source of supply may not be correctly maintained, leading to inconsistencies in the validity dates.
- Planning Parameters: The planning parameters or settings in the APO system may not align with the dates defined in the source of supply.
Solution:
- Check Validity Dates: Review the validity start and end dates for the source of supply in the master data. Ensure that the end date does not exceed the maximum allowed date.
- Adjust Configuration: If necessary, adjust the configuration settings in the APO system to allow for a wider range of validity dates, if that aligns with your business processes.
- Update Master Data: If the master data is incorrect, update the source of supply details to reflect the correct validity dates.
- Consult Documentation: Refer to SAP documentation or consult with your SAP Basis or APO consultant to understand the specific configuration settings that may be causing this issue.
Related Information:
/SAPAPO/CTM
for planning or /SAPAPO/MAT1
for maintaining master data.If the issue persists after following these steps, it may be beneficial to engage with SAP support or a consultant who specializes in SAP APO for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CTM1383
Validity end date for source of supply &1 is smaller than standard value
What causes this issue? The validity end date that you have specified for the in-house production source of supply &V1&, is &V2&. In ...
/SAPAPO/CTM1382
Validity start date for source of supply &1 is larger than standard value
What causes this issue? The validity start date that you have specified for the in-house production source of supply &V1&, is &V2&. I...
/SAPAPO/CTM1385
Scrap for activity &1 (source of supply &2) is smaller than stndrd value
What causes this issue? The scrap that you have specified for activity &V1& in source of supply &V2&, is &V3&. In the check p...
/SAPAPO/CTM1386
Scrap for activity &1 (source of supply &2) is larger than standard value
What causes this issue? The scrap that you have specified for activity &V1& in source of supply &V2&, is &V3&. In the check p...
Click on this link to search all SAP messages.