Message type: E = Error
Message class: /SAPAPO/CTM1 -
Message number: 349
Message text: Resource must have 100% capacity load
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CTM1349
- Resource must have 100% capacity load ?The SAP error message /SAPAPO/CTM1349 indicates that a resource in the SAP Advanced Planning and Optimization (APO) system is expected to have a 100% capacity load, but it does not meet this requirement. This error typically arises during the Capacity Planning or Production Planning processes when the system attempts to allocate production orders to resources that are not fully utilized.
Cause: Resource Configuration: The resource may be configured to require a 100% load for certain operations, but the planned orders or production orders do not utilize the full capacity. Capacity Constraints: There may be constraints in the planning run that prevent the resource from being fully loaded, such as other orders taking precedence or scheduling conflicts. Order Quantity: The quantity of the planned orders may not be sufficient to utilize the full capacity of the resource. Planning Strategy: The planning strategy used may not align with the requirement for full capacity utilization. Resource Availability: The resource
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/CTM1348
No data found for resource &1
What causes this issue? In the current PPM you are using a resource for which CTM planning could not determine any data.System Response The system i...
/SAPAPO/CTM1347
Plan &1 has more than one activity without predecessors
What causes this issue? The CTM master data check issues this message in the following cases: The PPM has parallel activities without predecessors. S...
/SAPAPO/CTM1350
No plan exists for in-house production source of supply &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CTM1351
External proc. for product &1, location &2; source of supply &3 not used
What causes this issue? For the current location product, you specified procurement type <ZK>external procurement</> (F). CTM planning th...
Click on this link to search all SAP messages.