How To Fix /SAPAPO/CTM1349 - Resource must have 100% capacity load


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CTM1 -

  • Message number: 349

  • Message text: Resource must have 100% capacity load

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CTM1349 - Resource must have 100% capacity load ?

    The SAP error message /SAPAPO/CTM1349 indicates that a resource in the SAP Advanced Planning and Optimization (APO) system is expected to have a 100% capacity load, but it does not meet this requirement. This error typically arises during the Capacity Planning or Production Planning processes when the system attempts to allocate production orders to resources that are not fully utilized.

    Cause:

    1. Resource Configuration: The resource may be configured to require a 100% load for certain operations, but the planned orders or production orders do not utilize the full capacity.
    2. Capacity Constraints: There may be constraints in the planning run that prevent the resource from being fully loaded, such as other orders taking precedence or scheduling conflicts.
    3. Order Quantity: The quantity of the planned orders may not be sufficient to utilize the full capacity of the resource.
    4. Planning Strategy: The planning strategy used may not align with the requirement for full capacity utilization.
    5. Resource Availability: The resource may not be available for the entire planning period, leading to underutilization.

    Solution:

    1. Review Resource Settings: Check the configuration of the resource in the APO system. Ensure that the capacity settings are appropriate for the intended use.
    2. Adjust Production Orders: Modify the quantities of the production orders to ensure that they align with the resource's capacity. This may involve increasing the order quantities or scheduling additional orders.
    3. Change Planning Parameters: If applicable, adjust the planning parameters or strategies to allow for more flexible capacity utilization.
    4. Check Scheduling Conflicts: Investigate any scheduling conflicts that may be preventing the resource from being fully utilized. Resolve any issues that may be causing delays or overlaps.
    5. Capacity Planning Run: Rerun the capacity planning process after making adjustments to see if the error persists.
    6. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on capacity planning and resource management.

    Related Information:

    • Transaction Codes: You may use transaction codes like /SAPAPO/CTM for the Capacity Planning run or /SAPAPO/RES for resource management.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • User Forums: Engage with SAP community forums or user groups for insights from other users who may have encountered similar issues.

    By addressing the underlying causes and making the necessary adjustments, you should be able to resolve the error and ensure that your resources are utilized effectively.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker