How To Fix /SAPAPO/CTM1349 - Resource must have 100% capacity load


/SAPAPO/CTM1349 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CTM1 -

  • Message number: 349

  • Message text: Resource must have 100% capacity load

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CTM1349 - Resource must have 100% capacity load ?
    The SAP error message /SAPAPO/CTM1349 indicates that a resource in the SAP Advanced Planning and Optimization (APO) system is expected to have a 100% capacity load, but it does not meet this requirement. This error typically arises during the Capacity Planning or Production Planning processes when the system attempts to allocate production orders to resources that are not fully utilized.
    
    Cause: Resource Configuration: The resource may be configured to require a 100% load for certain operations, but the planned orders or production orders do not utilize the full capacity. Capacity Constraints: There may be constraints in the planning run that prevent the resource from being fully loaded, such as other orders taking precedence or scheduling conflicts. Order Quantity: The quantity of the planned orders may not be sufficient to utilize the full capacity of the resource. Planning Strategy: The planning strategy used may not align with the requirement for full capacity utilization. Resource Availability: The resource

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author