How To Fix /SAPAPO/CMDS_SCO234 - - Minimum days' supply error: &1 calendar days


/SAPAPO/CMDS_SCO234 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CMDS_SCO -

  • Message number: 234

  • Message text: - Minimum days' supply error: &1 calendar days

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CMDS_SCO234 - - Minimum days' supply error: &1 calendar days ?
    The SAP error message /SAPAPO/CMDS_SCO234 - Minimum days' supply error: &1 calendar days typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with supply chain planning and demand management. This error indicates that the minimum days' supply requirement for a product is not being met based on the current planning parameters.
    
    Cause: The error is triggered when the system calculates the supply for a product and finds that it does not meet the minimum days' supply requirement defined in the planning settings. This can happen due to several reasons, including: Insufficient Stock: The available stock is less than what is required to meet the minimum days' supply. Demand Fluctuations: A sudden increase in demand that was not anticipated can lead to a shortfall in supply. Planning Parameters: Incorrect or overly restrictive planning parameters may be set, such as minimum stock levels or lead times. Supply Constraints: Issues with suppliers or

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker