How To Fix /SAPAPO/CMDS_HEUR409 - &1 sales scheduling agreement items were selected


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CMDS_HEUR -

  • Message number: 409

  • Message text: &1 sales scheduling agreement items were selected

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CMDS_HEUR409 - &1 sales scheduling agreement items were selected ?

    The SAP error message /SAPAPO/CMDS_HEUR409 typically occurs in the context of Advanced Planning and Optimization (APO) when dealing with sales scheduling agreements. This error indicates that there are issues with the selection of sales scheduling agreement items during the planning run.

    Cause:

    The error message /SAPAPO/CMDS_HEUR409 is generally triggered by one or more of the following reasons:

    1. Inconsistent Data: There may be inconsistencies in the data related to the sales scheduling agreements, such as missing or incorrect information in the master data (e.g., material master, vendor master).

    2. Planning Parameters: The planning parameters set for the sales scheduling agreements may not be appropriate, leading to issues in the selection process.

    3. Scheduling Agreement Status: The status of the scheduling agreements may not allow them to be processed. For example, if the agreement is blocked or not valid for the planning period.

    4. Selection Criteria: The selection criteria used in the planning run may not match the available scheduling agreements, leading to no items being selected.

    Solution:

    To resolve the error, you can take the following steps:

    1. Check Data Consistency:

      • Verify the master data for the materials and vendors involved in the scheduling agreements.
      • Ensure that all necessary fields are filled out correctly and that there are no missing entries.
    2. Review Planning Parameters:

      • Check the planning parameters set for the sales scheduling agreements in the APO system.
      • Adjust the parameters if they are not aligned with the requirements of the scheduling agreements.
    3. Examine Scheduling Agreement Status:

      • Review the status of the sales scheduling agreements to ensure they are active and valid for the planning period.
      • If any agreements are blocked or inactive, take the necessary steps to unblock or activate them.
    4. Adjust Selection Criteria:

      • Review the selection criteria used in the planning run to ensure they are appropriate for the scheduling agreements you want to process.
      • Modify the criteria if necessary to include the relevant scheduling agreements.
    5. Run Planning Again:

      • After making the necessary adjustments, rerun the planning process to see if the error persists.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like /SAPAPO/CMDS for planning runs or /SAPAPO/SDP94 for viewing scheduling agreements.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance.
    • Documentation: Refer to SAP documentation for Advanced Planning and Optimization for more detailed information on scheduling agreements and planning runs.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who specializes in SAP APO for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author