How To Fix /SAPAPO/CMDS_HEUR408 - Sales scheduling agreement item &1/&2 could not be planned


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CMDS_HEUR -

  • Message number: 408

  • Message text: Sales scheduling agreement item &1/&2 could not be planned

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CMDS_HEUR408 - Sales scheduling agreement item &1/&2 could not be planned ?

    The SAP error message /SAPAPO/CMDS_HEUR408 indicates that a sales scheduling agreement item could not be planned in the Advanced Planning and Optimization (APO) module. This error typically arises during the planning process when certain conditions or data requirements are not met.

    Causes:

    1. Missing Master Data: The relevant master data (like material master, vendor master, or customer master) may be incomplete or missing.
    2. Planning Object Structure Issues: The planning object structure may not be correctly defined or may not include the sales scheduling agreement item.
    3. Data Inconsistencies: There may be inconsistencies in the data related to the sales scheduling agreement, such as invalid dates or quantities.
    4. Planning Version Issues: The planning version being used may not be set up correctly or may not include the sales scheduling agreement item.
    5. Product Availability Check: The product may not be available for planning due to stock issues or other constraints.
    6. Planning Parameters: Incorrect planning parameters or settings in the APO system can lead to this error.

    Solutions:

    1. Check Master Data: Ensure that all relevant master data is complete and correctly maintained. This includes checking the material master, vendor master, and customer master data.
    2. Review Planning Object Structure: Verify that the planning object structure includes the sales scheduling agreement item and is correctly configured.
    3. Data Consistency Check: Review the sales scheduling agreement for any inconsistencies, such as invalid dates or quantities, and correct them.
    4. Planning Version Configuration: Ensure that the planning version being used is correctly set up and includes the necessary data for the sales scheduling agreement.
    5. Product Availability: Check the availability of the product and resolve any stock issues that may prevent planning.
    6. Adjust Planning Parameters: Review and adjust the planning parameters in the APO system to ensure they are set correctly for the sales scheduling agreement.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like /SAPAPO/SDP94 (for planning board) or /SAPAPO/MC90 (for planning book) to analyze the planning data.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.
    • Documentation: Refer to SAP documentation for detailed information on planning in APO and troubleshooting common errors.

    If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or refer to SAP community forums for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker