Message type: E = Error
Message class: /SAPAPO/CDPSPRESENTA -
Message number: 008
Message text: End of horizon is before the start of horizon
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSPRESENTA008
- End of horizon is before the start of horizon ?The SAP error message /SAPAPO/CDPSPRESENTA008 indicates that there is an issue with the planning horizon settings in the Advanced Planning and Optimization (APO) module. Specifically, it means that the end of the planning horizon is set before the start of the planning horizon, which is logically incorrect.
Cause: Incorrect Planning Horizon Settings: The planning horizon may have been configured incorrectly in the system, leading to the end date being set before the start date. Master Data Issues: There may be inconsistencies in the master data that define the planning horizon. Configuration Errors: Errors in the configuration of the planning area or planning book can also lead to this issue.
Solution: Check Planning Horizon Settings: Go to the configuration settings for the planning area or planning book in APO. Verify the start and end dates of the planning horizon. Ensure that the end date is after the start date. Adjust Master Data: Review the master data related to the planning area.
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/CDPSPRESENTA007
Control cannot be created
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSPRESENTA006
Current settings saved
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSPRESENTA009
Error occurred when communicating with control
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSPRESENTA010
Help text cannot be displayed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.