Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 718
Message text: Activity &1 rescheduled for another date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT718
- Activity &1 rescheduled for another date ?The SAP error message /SAPAPO/CDPSOPT718 Activity &1 rescheduled for another date typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly within the context of production planning and scheduling. This message indicates that a specific activity (denoted by &1) has been rescheduled to a different date, which can happen for various reasons. Causes: Resource Constraints: The activity may have been rescheduled due to resource availability issues, such as machine breakdowns or unavailability of labor. Capacity Overload: If the planned activities exceed the available capacity of resources, the system may automatically reschedule some activities to balance the load. Dependencies: Activities may have dependencies on other activities or materials that are not available, leading to a rescheduling. Changes in Demand: Changes in demand or changes in the production plan can lead to the rescheduling of activities. Planning Parameters: Incorrect or suboptimal planning parameters may lead to unexpected scheduling behavior. Solutions: Check Resource Availability: Review the availability of
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/CDPSOPT717
Number of activities deallocated and expedited in horizon: &1
The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Procedure for System Adminis...
/SAPAPO/CDPSOPT716
Optimization must schedule an operation of order &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT719
Activity &1 not rescheduled
What causes this issue? Activity &V1& could not be scheduled when the optimization results were loaded back through the online scheduler: &am...
/SAPAPO/CDPSOPT720
Bucket capacity not considered during bottleneck optimization.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.