How To Fix /SAPAPO/CDPSOPT717 - Number of activities deallocated and expedited in horizon: &1


/SAPAPO/CDPSOPT717 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSOPT -

  • Message number: 717

  • Message text: Number of activities deallocated and expedited in horizon: &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSOPT717 - Number of activities deallocated and expedited in horizon: &1 ?
    The SAP error message /SAPAPO/CDPSOPT717 typically relates to the Advanced Planning and Optimization (APO) module in SAP, specifically in the context of Capacity Planning and Production Planning. This message indicates that there is a discrepancy in the number of activities that have been deallocated and expedited within a specified planning horizon.
    
    Cause: Planning Horizon Issues: The planning horizon may not be set correctly, leading to unexpected behavior in the scheduling of activities. Resource Constraints: There may be resource constraints that prevent activities from being scheduled or expedited as expected.
    Configuration Issues: Incorrect configuration settings in the APO system can lead to this error, particularly in the settings related to capacity planning and scheduling. Data Inconsistencies: Inconsistencies in master data (like resource availability, production versions, etc.) can also lead to this error. Optimization Settings: The optimization settings may not be aligned with the current planning requirements, causing issues in activity allocation.
    Solution: Check Planning Horizon: Ensure that the planning

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant