Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 370
Message text: Resource &1: Bucket resources can not be planned
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT370
- Resource &1: Bucket resources can not be planned ?The SAP error message
/SAPAPO/CDPSOPT370 Resource &1: Bucket resources can not be planned
typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with resource planning in the Supply Chain Management (SCM) module. This error indicates that the system is trying to plan a bucket resource, which is not allowed in the current context.Cause:
- Bucket Resource Type: The resource in question is defined as a bucket resource. Bucket resources are typically used for planning in time buckets (e.g., daily, weekly) and are not suitable for certain types of planning scenarios, such as detailed scheduling or finite capacity planning.
- Planning Strategy: The planning strategy or the planning scenario being used may not support bucket resources. For example, if you are trying to perform detailed scheduling, the system expects a different type of resource.
- Resource Configuration: The resource may not be configured correctly in the system, leading to the inability to plan it as intended.
Solution:
- Check Resource Type: Verify the type of resource you are trying to plan. If it is indeed a bucket resource, consider whether it is appropriate for the planning scenario you are using.
- Change Planning Strategy: If the planning scenario requires a different type of resource, you may need to adjust your planning strategy or use a different resource that is compatible with the planning method.
- Resource Configuration: Review the configuration of the resource in the SAP system. Ensure that it is set up correctly for the type of planning you are attempting. This may involve checking the resource master data and ensuring that it is not marked as a bucket resource if it should be a different type.
- Use Alternative Resources: If bucket resources are not suitable for your planning needs, consider using alternative resources that can be planned according to your requirements.
Related Information:
By addressing the root cause of the error and ensuring that the resources and planning strategies are aligned, you should be able to resolve the issue effectively.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT368
Maximum earliness of product receipts is not considered
The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Procedure for System Adminis...
/SAPAPO/CDPSOPT367
No product can be uniquely assigned to resource &1
What causes this issue? Resource &V1& is a <DS:GLOS.226ECF762F32D411AB370060B03C3B0B>container resource</>. You have chosen multi...
/SAPAPO/CDPSOPT371
Activity in order &1 cannot be moved; no solution is possible
What causes this issue? You have selected an activity in order &V1& that cannot be moved. This might be because the activity is <DS:TX.OPT...
/SAPAPO/CDPSOPT372
Storage characteristics cannot be considered; see long text
What causes this issue? You want storage characteristics to be considered during the optimization run. The modes on the <DS:GLOS.226ECF762F32D411A...
Click on this link to search all SAP messages.