Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 368
Message text: Maximum earliness of product receipts is not considered
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT368
- Maximum earliness of product receipts is not considered ?The SAP error message /SAPAPO/CDPSOPT368 indicates that the maximum earliness of product receipts is not being considered in the planning process. This typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with production planning and scheduling.
Cause: The error can arise due to several reasons:
Configuration Issues: The maximum earliness setting may not be properly configured in the system. This could be due to incorrect settings in the product master data or in the planning parameters. Planning Strategy: The planning strategy being used may not support the maximum earliness feature, or it may not be applicable for the specific product or scenario. Data Inconsistencies: There may be inconsistencies in the master data, such as lead times, production times, or receipt times that do not align with the maximum earliness settings. Planning Run Parameters: The parameters set for the planning run may not include considerations for maximum earliness, leading to
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/CDPSOPT367
No product can be uniquely assigned to resource &1
The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Procedure for System Adminis...
/SAPAPO/CDPSOPT366
Resource &1: Storage property causes unsolvable problems
The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Procedure for System Adminis...
/SAPAPO/CDPSOPT370
Resource &1: Bucket resources can not be planned
What causes this issue? Resource &V1& is a <DS:GLOS.3668CFAF3DDE66D5E10000009B38F983>bucket resource</>. Optimization is not able...
/SAPAPO/CDPSOPT371
Activity in order &1 cannot be moved; no solution is possible
What causes this issue? You have selected an activity in order &V1& that cannot be moved. This might be because the activity is <DS:TX.OPT...
Click on this link to search all SAP messages.