Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 368
Message text: Maximum earliness of product receipts is not considered
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT368
- Maximum earliness of product receipts is not considered ?The SAP error message
/SAPAPO/CDPSOPT368
indicates that the maximum earliness of product receipts is not being considered in the planning process. This typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with production planning and scheduling.Cause:
The error can arise due to several reasons:
Configuration Issues: The maximum earliness setting may not be properly configured in the system. This could be due to incorrect settings in the product master data or in the planning parameters.
Planning Strategy: The planning strategy being used may not support the maximum earliness feature, or it may not be applicable for the specific product or scenario.
Data Inconsistencies: There may be inconsistencies in the master data, such as lead times, production times, or receipt times that do not align with the maximum earliness settings.
Planning Run Parameters: The parameters set for the planning run may not include considerations for maximum earliness, leading to this error.
Solution:
To resolve this error, you can take the following steps:
Check Product Master Data: Review the product master data for the affected product. Ensure that the maximum earliness settings are correctly defined in the relevant fields.
Review Planning Parameters: Check the planning parameters in the APO system. Ensure that the maximum earliness is enabled and correctly configured in the planning profile.
Adjust Planning Strategy: If the current planning strategy does not support maximum earliness, consider changing it to one that does. This may involve consulting with your planning team to determine the best strategy for your scenario.
Validate Lead Times: Ensure that all lead times and production times are accurately maintained in the system. Inconsistencies can lead to planning errors.
Run Planning with Correct Parameters: When executing the planning run, ensure that the parameters include considerations for maximum earliness. This may involve adjusting the settings in the planning run transaction.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on configuring maximum earliness in your version of SAP APO.
Related Information:
By following these steps, you should be able to identify the root cause of the error and implement a solution to ensure that the maximum earliness of product receipts is considered in your planning processes.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT367
No product can be uniquely assigned to resource &1
The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Procedure for System Adminis...
/SAPAPO/CDPSOPT366
Resource &1: Storage property causes unsolvable problems
The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Procedure for System Adminis...
/SAPAPO/CDPSOPT370
Resource &1: Bucket resources can not be planned
What causes this issue? Resource &V1& is a <DS:GLOS.3668CFAF3DDE66D5E10000009B38F983>bucket resource</>. Optimization is not able...
/SAPAPO/CDPSOPT371
Activity in order &1 cannot be moved; no solution is possible
What causes this issue? You have selected an activity in order &V1& that cannot be moved. This might be because the activity is <DS:TX.OPT...
Click on this link to search all SAP messages.