Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 259
Message text: Activity/mode &1 finishes outside of the optimization horizon
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT259
- Activity/mode &1 finishes outside of the optimization horizon ?The SAP error message /SAPAPO/CDPSOPT259 Activity/mode &1 finishes outside of the optimization horizon typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with production planning and scheduling. This error indicates that a specific activity or mode is scheduled to finish outside the defined optimization horizon, which is the time frame within which the system is allowed to optimize planning activities.
Cause: Optimization Horizon Settings: The optimization horizon may be set too short, causing activities to be scheduled beyond this limit. Activity Duration: The duration of the activity or mode is longer than the remaining time in the optimization horizon. Scheduling Conflicts: There may be conflicts in scheduling due to dependencies or constraints that push the activity's end time beyond the horizon. Incorrect Data: There may be incorrect or incomplete data in the master data or transaction data that leads to unrealistic scheduling.
Solution: Adjust Optimization Horizon: Increase the optimization horizon in
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/CDPSOPT258
Activity/mode &1 starts outside of the optimization horizon
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT257
Activity &1 does not have a mode
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT260
Activity/mode &1 has a net duration outside of the optimization horizon
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT261
Planning period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.