How To Fix /SAPAPO/CDPSOPT258 - Activity/mode &1 starts outside of the optimization horizon


/SAPAPO/CDPSOPT258 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSOPT -

  • Message number: 258

  • Message text: Activity/mode &1 starts outside of the optimization horizon

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSOPT258 - Activity/mode &1 starts outside of the optimization horizon ?
    The SAP error message /SAPAPO/CDPSOPT258 Activity/mode &1 starts outside of the optimization horizon typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with production planning and scheduling. This error indicates that a specific activity or mode is scheduled to start outside the defined optimization horizon, which is the time frame within which the system is configured to perform planning and optimization.
    
    Cause: Optimization Horizon Settings: The optimization horizon is defined in the planning settings. If an activity is scheduled to start before or after this horizon, the system will raise this error. Incorrect Activity Scheduling: The activity or mode may have been scheduled incorrectly, leading to a start time that falls outside the defined optimization horizon. Changes in Demand or Supply: Changes in demand or supply that were not accounted for in the planning run can lead to scheduling conflicts. Master Data Issues: Incorrect or incomplete master data (like

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author