Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 228
Message text: Locked activity chain &1 has incompatible mode &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT228
- Locked activity chain &1 has incompatible mode &2 ?The SAP error message /SAPAPO/CDPSOPT228 Locked activity chain &1 has incompatible mode &2 typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with activity chains in the SAP APO system. This error indicates that there is a conflict in the mode of an activity chain that is currently locked, which prevents the execution of certain operations.
Cause: Locked Activity Chain: The activity chain specified in the error message is currently locked, meaning that it is being processed or modified by another user or process. Incompatible Mode: The mode of the activity chain (e.g., whether it is set to run in a certain way) is incompatible with the operation you are trying to perform. This could be due to settings that do not align with the current state of the activity chain.
Solution: Check Lock Status: Verify if the activity chain is indeed locked. You can do this by checking
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/CDPSOPT227
Locked activity chain &1 not valid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT226
Invalid operation &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT229
Locked activity chain &1:Primary resource is not a single-activity resrc.
What causes this issue? The primary resource for mode &V3& of activity &V2& in the locked activity chain &V1& is not a single...
/SAPAPO/CDPSOPT230
Locked activity chain &1: Activities do not have the same setup ID
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.