Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 227
Message text: Locked activity chain &1 not valid
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT227
- Locked activity chain &1 not valid ?The SAP error message
/SAPAPO/CDPSOPT227 Locked activity chain &1 not valid
typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with the Capacity Planning or Production Planning functionalities. This error indicates that there is an issue with an activity chain that is currently locked and cannot be processed or accessed.Cause:
- Locked Activity Chain: The activity chain specified in the error message is locked, which means that it is currently being used or modified by another user or process. This can happen if a user is running a planning job or if there is a system process that has not yet released the lock.
- Invalid Activity Chain: The activity chain may not be valid due to configuration issues, or it may have been deleted or modified in a way that makes it unusable.
- Authorization Issues: The user may not have the necessary authorizations to access or modify the activity chain.
Solution:
- Check Locks: Use transaction code
SM12
to check for any locks on the activity chain. If you find that the activity chain is locked by another user or process, you may need to wait for that process to complete or contact the user to release the lock.- Validate Activity Chain: Ensure that the activity chain exists and is correctly configured. You can do this by checking the configuration in the relevant planning area or by using transaction codes like
/SAPAPO/MC90
to view the activity chains.- Review Authorizations: Ensure that the user has the necessary authorizations to access and modify the activity chain. You may need to consult with your SAP security team to verify and adjust user roles and permissions.
- Restart the Process: If the issue persists, consider restarting the planning job or process that is trying to access the locked activity chain. This may help in releasing any temporary locks.
- System Logs: Check the system logs for any additional error messages or warnings that may provide more context about the issue.
Related Information:
SM12
(to check locks), SM21
(to view system logs), and /SAPAPO/MC90
(to manage activity chains).If the problem continues after trying the above solutions, it may be beneficial to reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT226
Invalid operation &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT225
Order &1 not valid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT228
Locked activity chain &1 has incompatible mode &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT229
Locked activity chain &1:Primary resource is not a single-activity resrc.
What causes this issue? The primary resource for mode &V3& of activity &V2& in the locked activity chain &V1& is not a single...
Click on this link to search all SAP messages.