How To Fix /SAPAPO/BLRG025 - End of plan explosion on &1 at &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/BLRG -

  • Message number: 025

  • Message text: End of plan explosion on &1 at &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/BLRG025 - End of plan explosion on &1 at &2 ?

    The SAP error message /SAPAPO/BLRG025 indicates that there was an issue during the planning process in SAP Advanced Planning and Optimization (APO). Specifically, this message signifies that the end of the plan explosion has been reached for a particular planning object (like a product or a location) at a specified time.

    Cause:

    The error can occur due to several reasons, including:

    1. Planning Object Configuration: The planning object may not be properly configured or may have missing data that is required for the planning process.
    2. Data Inconsistencies: There may be inconsistencies in the master data or transaction data that prevent the planning process from completing successfully.
    3. Resource Constraints: There may be constraints related to resources, such as capacity limits or availability issues, that prevent the planning process from proceeding.
    4. Planning Version Issues: The planning version being used may not be set up correctly or may not have the necessary data for the planning run.
    5. Time Period Issues: The time period for the planning run may not be valid or may not align with the data available in the system.

    Solution:

    To resolve the /SAPAPO/BLRG025 error, you can take the following steps:

    1. Check Configuration: Review the configuration of the planning object to ensure that all necessary data is present and correctly set up.
    2. Validate Master Data: Ensure that the master data (e.g., product master, location master) is complete and consistent. Look for any missing or incorrect entries.
    3. Review Resource Availability: Check the availability of resources and ensure that there are no capacity constraints that could be causing the planning process to fail.
    4. Examine Planning Version: Verify that the correct planning version is being used and that it contains the necessary data for the planning run.
    5. Adjust Time Period: Ensure that the time period specified for the planning run is valid and that there is data available for that period.
    6. Check Logs and Messages: Review any additional logs or messages that may provide more context about the error. This can help identify specific issues that need to be addressed.

    Related Information:

    • Transaction Codes: You may want to use transaction codes like /SAPAPO/MC90 (to check planning books) or /SAPAPO/DP (for demand planning) to analyze the planning data.
    • SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • Documentation: Refer to the SAP APO documentation for more detailed information on planning processes and error handling.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who specializes in SAP APO for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant