How To Fix /SAPAPO/BLRG024 - Start of plan explosion on &1 at &2


/SAPAPO/BLRG024 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/BLRG -

  • Message number: 024

  • Message text: Start of plan explosion on &1 at &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/BLRG024 - Start of plan explosion on &1 at &2 ?
    The SAP error message /SAPAPO/BLRG024 Start of plan explosion on &1 at &2 typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is an issue during the planning process, particularly during the planning explosion of a product or a planning run.
    
    Cause: Data Issues: The error may arise due to missing or incorrect master data, such as product master data, location data, or bill of materials (BOM).
    Configuration Issues: Incorrect configuration settings in the planning area or planning book can lead to this error. Resource Constraints: If there are insufficient resources or capacity constraints, the planning explosion may fail. Planning Version: The planning version being used may not be correctly set up or may not have the necessary data. Locking Issues: If another process is locking the data that is needed for the planning explosion, it can cause this error.
    Solution: Check Master Data: Verify that all relevant master data (product, location, BOM,

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker