How To Fix /SAPAPO/BLRG014 - End of requirements generation for resource &1 on &2 at &3


/SAPAPO/BLRG014 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/BLRG -

  • Message number: 014

  • Message text: End of requirements generation for resource &1 on &2 at &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/BLRG014 - Details

  • The SAP error message /SAPAPO/BLRG014 indicates that there was an issue during the requirements generation process for a specific resource in the Advanced Planning and Optimization (APO) module. This message typically occurs in the context of production planning and scheduling, where the system is trying to generate requirements for a resource (like a machine or labor) at a specific date and time.
    
    Cause: The error can be caused by several factors, including: Resource Capacity Issues: The resource may not have enough capacity to handle the requirements being generated. Incorrect Master Data: There may be issues with the master data related to the resource, such as incorrect settings in the resource profile or capacity planning. Planning Version Issues: The planning version being used may not be correctly set up or may be inactive. Time Period Issues: The time period for which the requirements are being generated may not be valid or may fall outside the planning horizon. Configuration

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/BLRG014 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant