Message type: E = Error
Message class: /SAPAPO/BLRG -
Message number: 012
Message text: Start of requirements generation for resource &1 on &2 at &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message /SAPAPO/BLRG012 typically indicates an issue related to the generation of requirements for a specific resource in the Advanced Planning and Optimization (APO) module. This error can occur during the planning process when the system attempts to generate requirements for a resource but encounters a problem.
Cause: The error message /SAPAPO/BLRG012 can be caused by several factors, including: Resource
Configuration Issues: The resource may not be properly configured in the system, leading to issues during the requirements generation process. Missing Master Data: Required master data (such as product, location, or resource) may be missing or incomplete. Planning Version Issues: The planning version being used may not be set up correctly or may not have the necessary data. Locking Issues: The resource may be locked by another process, preventing the requirements generation from proceeding. Time Period Issues: The time period for which the requirements are being generated may not be valid or may not have
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/BLRG011
Creation of a forecast for product &1 is not permitted
What causes this issue? You wanted to create a forecast for a configured product. In the case of configured products, requirements have to be configu...
/SAPAPO/BLRG010
Error during update in block planning (table &1)
What causes this issue? An internal error occurred during the update to the database.System Response The system terminates the operation.How to fix ...
/SAPAPO/BLRG013
Inconsistency between liveCache and block planning data for resource &1
What causes this issue? The internal tables used do not match between the function and <ZK>liveCache</>. Possible reasons for this are: A...
/SAPAPO/BLRG014
End of requirements generation for resource &1 on &2 at &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.