Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/ATPLOG_PAL -
Message number: 234
Message text: Requirements were not transferred
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/ATPLOG_PAL234
- Requirements were not transferred ?The SAP error message
/SAPAPO/ATPLOG_PAL234 Requirements were not transferred
typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with the transfer of requirements from the SAP ERP system to the APO system. This can happen during the process of demand planning or when trying to perform Available-to-Promise (ATP) checks.Causes:
- Configuration Issues: There may be configuration problems in the APO system or in the integration settings between SAP ERP and APO.
- Master Data Issues: Missing or incorrect master data (like material master, location, or product data) can prevent the transfer of requirements.
- Data Transfer Errors: Issues during the data transfer process, such as network problems or system downtime, can lead to this error.
- Planning Version Issues: The planning version being used may not be set up correctly or may not be active.
- Authorization Issues: The user may not have the necessary authorizations to transfer requirements.
Solutions:
- Check Configuration: Review the configuration settings in both the SAP ERP and APO systems to ensure they are correctly set up for data transfer.
- Verify Master Data: Ensure that all relevant master data is complete and accurate. Check for missing materials or incorrect settings.
- Monitor Data Transfer: Use transaction codes like
SMQ1
andSMQ2
to monitor the queues for any stuck or failed messages. Resolve any issues found there.- Check Planning Version: Ensure that the planning version you are using is active and correctly configured for the requirements you are trying to transfer.
- Review Authorizations: Check the user authorizations to ensure that the user has the necessary permissions to perform the transfer.
- Consult Logs: Look at the application logs (transaction SLG1) for more detailed error messages that can provide additional context on the failure.
Related Information:
/SAPAPO/ATPL
for ATP checks, SCC4
for client settings, and SMD
for monitoring data transfer.If the issue persists after trying the above solutions, it may be beneficial to engage with SAP support or consult with a technical expert who specializes in SAP APO.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/ATPLOG_PAL233
Items were not copied
What causes this issue? No item entry was found in the requirements table for item &v1&/&v2&.System Response The system issues an er...
/SAPAPO/ATPLOG_PAL232
Consumption instructions do not exist (product allocation procedure)
What causes this issue? Consumption instructions were not generated for item &v1&/&v2& (&v3& / &v4&). The quantity is...
/SAPAPO/ATPLOG_PAL235
Special consumption period was not copied: Use standard
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/ATPLOG_PAL236
Quantity could not be confirmed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.