Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/ATP_BOP -
Message number: 813
Message text: LC error (return code &1) when reading confirmations for sched. agrmt &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/ATP_BOP813
- LC error (return code &1) when reading confirmations for sched. agrmt &2 ?The SAP error message
/SAPAPO/ATP_BOP813 LC
typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with reading confirmations for a scheduling agreement. The error message indicates that there is a problem with the return code, which is specified as&1
, and it relates to a specific scheduling agreement identified by&2
.Cause:
The error can be caused by several factors, including but not limited to:
- Data Inconsistencies: There may be inconsistencies in the data related to the scheduling agreement or the confirmations being processed.
- Authorization Issues: The user may not have the necessary authorizations to read the confirmations for the specified scheduling agreement.
- Configuration Issues: There may be configuration problems in the APO system that prevent it from correctly processing the scheduling agreement.
- System Performance: If the system is under heavy load, it may not be able to process the request in a timely manner, leading to timeouts or other errors.
- Missing or Incorrect Master Data: Required master data (like material master, vendor master, etc.) may be missing or incorrectly configured.
Solution:
To resolve the error, you can take the following steps:
- Check Return Code: Analyze the return code
&1
to understand the specific issue. This may provide more context on what went wrong.- Review Scheduling Agreement: Verify the details of the scheduling agreement
&2
to ensure that it is correctly set up and that all necessary data is present.- Check Authorizations: Ensure that the user executing the transaction has the necessary authorizations to access the scheduling agreement and its confirmations.
- Data Consistency Check: Run consistency checks on the relevant master data and transactional data to identify any discrepancies.
- System Logs: Check the system logs (transaction SLG1) for any additional error messages or warnings that may provide more context.
- Performance Monitoring: Monitor system performance to ensure that it is not overloaded. If necessary, optimize the system or schedule the job during off-peak hours.
- Consult Documentation: Refer to SAP documentation or notes related to the specific error message for additional troubleshooting steps or patches.
Related Information:
/SAPAPO/ATC
for checking the configuration and /SAPAPO/ATP
for analyzing the ATP (Available to Promise) settings.If the problem persists after following these steps, it may be necessary to involve SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/ATP_BOP812
Error determining sched. lines for due delvry sched. from LC (VLP &2 &3)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/ATP_BOP811
Error determining schedule lines for the confirmation from LC (SSA &2 &3)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/ATP_BOP999
Application has not been released
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/BLRG001
Planning version &1 does not match the forecast data
What causes this issue? In the block definition in the resource master data, you have restricted the data relevant for the forecast on the <ZK>...
Click on this link to search all SAP messages.