Message type: E = Error
Message class: /SAPAPO/ATP_BOP -
Message number: 811
Message text: Error determining schedule lines for the confirmation from LC (SSA &2 &3)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/ATP_BOP811
- Error determining schedule lines for the confirmation from LC (SSA &2 &3) ?The SAP error message /SAPAPO/ATP_BOP811 typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with determining schedule lines for a confirmation from a location (LC). This error can arise due to various reasons, and understanding the cause is crucial for finding an appropriate solution. Causes of the Error Missing or Incorrect Master Data: The error may occur if there are missing or incorrect master data settings for the materials, locations, or other relevant entities in the system.
Configuration Issues: Incorrect configuration in the APO system, such as settings related to the ATP (Available to Promise) check or the business processes, can lead to this error. Inconsistent Data: If there are inconsistencies in the data between the SAP ERP and APO systems, it can cause issues in schedule line determination. Planning Version Issues: The planning version being used may not be correctly set up or may not contain the
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/ATP_BOP810
Error determining the planning object for the SSA &1 &2
What causes this issue? The system could not find the planning object for the sales and distribution document for one of the following reasons: The p...
/SAPAPO/ATP_BOP809
An error occurred during deletion of temporary quantity assignments
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/ATP_BOP812
Error determining sched. lines for due delvry sched. from LC (VLP &2 &3)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/ATP_BOP813
LC error (return code &1) when reading confirmations for sched. agrmt &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.