Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix /SAPAPO/AMON_LIST657 - Resource overload by &DEV_PERCENT in bucket (PP/DS)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/AMON_LIST -

  • Message number: 657

  • Message text: Resource overload by &DEV_PERCENT in bucket (PP/DS)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/AMON_LIST657 - Resource overload by &DEV_PERCENT in bucket (PP/DS) ?

    The SAP error message /SAPAPO/AMON_LIST657 Resource overload by &DEV_PERCENT in bucket (PP/DS) typically occurs in the context of SAP Advanced Planning and Optimization (APO), specifically within the Production Planning and Detailed Scheduling (PP/DS) module. This error indicates that a resource is overloaded beyond its defined capacity in a specific time bucket.

    Cause:

    1. Resource Capacity Exceeded: The resource (e.g., machine, labor) has been scheduled for more work than it can handle in the specified time bucket. The &DEV_PERCENT indicates the percentage by which the resource is overloaded.
    2. Incorrect Capacity Settings: The capacity settings for the resource may not be configured correctly, leading to an underestimation of available capacity.
    3. High Demand: There may be an unexpected spike in demand for production, leading to scheduling conflicts and overloads.
    4. Inefficient Scheduling: The scheduling algorithm may not be optimizing the use of resources effectively, leading to bottlenecks.

    Solution:

    1. Review Resource Capacity: Check the capacity settings for the resource in question. Ensure that the available capacity is correctly defined in the system.
    2. Adjust Production Schedule: Modify the production schedule to distribute the workload more evenly across available resources. This may involve rescheduling some orders or changing the sequence of production.
    3. Increase Resource Capacity: If feasible, consider increasing the capacity of the resource (e.g., adding shifts, increasing machine hours).
    4. Analyze Demand: Review the demand forecast and adjust production plans accordingly. If there is a consistent over-demand, consider revising the production strategy.
    5. Use Alternative Resources: If possible, allocate work to alternative resources that have available capacity to alleviate the overload on the primary resource.
    6. Optimize Scheduling Parameters: Review and adjust the scheduling parameters in the PP/DS settings to improve the efficiency of the scheduling process.

    Related Information:

    • Monitoring Tools: Use the monitoring tools available in SAP APO to track resource utilization and identify potential bottlenecks before they lead to overloads.
    • Capacity Planning: Implement effective capacity planning strategies to ensure that resources are adequately prepared for expected demand.
    • Training and Documentation: Ensure that users involved in scheduling and capacity planning are well-trained and have access to relevant documentation to make informed decisions.

    By addressing the underlying causes of the resource overload and implementing appropriate solutions, you can mitigate the occurrence of this error and improve the efficiency of your production planning processes.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant