How To Fix /SAPAPO/AMON_LIST655 - Resource utilization in bucket (PP/DS)


/SAPAPO/AMON_LIST655 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/AMON_LIST -

  • Message number: 655

  • Message text: Resource utilization in bucket (PP/DS)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/AMON_LIST655 - Details

  • The SAP error message /SAPAPO/AMON_LIST655 related to resource utilization in the bucket (PP/DS) typically indicates that there is an issue with the resource allocation or utilization in the Advanced Planning and Optimization (APO) module, specifically in the Production Planning and Detailed Scheduling (PP/DS) area. This error can arise due to various reasons, including incorrect resource settings, capacity overload, or scheduling conflicts.
    Causes:
    
    Resource Capacity Issues: The resource may be overloaded, meaning that the planned production exceeds the available capacity for that resource.
    Incorrect Resource Settings: The configuration of the resource may not be set up correctly, leading to discrepancies in how capacity is calculated.
    Scheduling Conflicts: There may be overlapping production orders or planned orders that are scheduled to use the same resource at the same time.
    Bucket Size Issues: The time buckets defined in the planning horizon may not align with the resource's available capacity.
    Master Data Issues: Problems with master data, such as incorrect

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/AMON_LIST655 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker