How To Fix /SAPAPO/AMON_LIST077 - Resource underutilized (&UTILISATION_PERCENT %) from &VFROM to &VTO


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/AMON_LIST -

  • Message number: 077

  • Message text: Resource underutilized (&UTILISATION_PERCENT %) from &VFROM to &VTO

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/AMON_LIST077 - Resource underutilized (&UTILISATION_PERCENT %) from &VFROM to &VTO ?

    The SAP error message /SAPAPO/AMON_LIST077 indicates that a resource in the Advanced Planning and Optimization (APO) module is underutilized during a specified time period. This message typically arises in the context of production planning and scheduling, where the system is monitoring the utilization of resources (like machines, labor, etc.) against their capacity.

    Cause:

    1. Low Demand: The primary cause of this error is often low demand for the product that the resource is associated with, leading to the resource not being fully utilized.
    2. Inefficient Scheduling: The scheduling of production orders may not be optimized, resulting in gaps in production that lead to underutilization.
    3. Resource Constraints: There may be constraints or limitations in the production process that prevent the resource from being fully utilized.
    4. Incorrect Master Data: Issues with master data, such as incorrect capacity settings or production versions, can lead to miscalculations of resource utilization.
    5. Planning Parameters: The planning parameters set in the system may not align with actual production needs, leading to underutilization.

    Solution:

    1. Analyze Demand: Review the demand forecast and actual sales orders to determine if the low utilization is due to insufficient demand. Adjust forecasts if necessary.
    2. Optimize Scheduling: Use the APO tools to optimize the scheduling of production orders. This may involve adjusting the sequence of orders or consolidating orders to better utilize resources.
    3. Review Resource Settings: Check the resource settings in the system, including capacity, availability, and any constraints that may be affecting utilization.
    4. Adjust Planning Parameters: Review and adjust planning parameters to ensure they align with actual production needs. This may include lead times, safety stock levels, and reorder points.
    5. Monitor and Adjust: Continuously monitor resource utilization and make adjustments as needed. Implement regular reviews of production schedules and resource allocation.

    Related Information:

    • Transaction Codes: You can use transaction codes like /SAPAPO/AMON to access the monitoring tools in APO to analyze resource utilization.
    • Reports: Utilize standard APO reports to get insights into resource utilization and identify patterns or trends that may indicate issues.
    • Master Data Maintenance: Ensure that master data for resources, products, and production processes is regularly maintained and updated to reflect current operational realities.
    • Collaboration with Production Teams: Work closely with production and operations teams to understand the practical challenges they face and gather insights that can help improve resource utilization.

    By addressing the underlying causes and implementing the suggested solutions, you can mitigate the issue of resource underutilization and improve overall efficiency in your production planning processes.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant