Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/AMON_ALERTS -
Message number: 014
Message text: Maximum time interval between activities exceeded
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/AMON_ALERTS014
- Maximum time interval between activities exceeded ?The SAP error message
/SAPAPO/AMON_ALERTS014
indicates that the maximum time interval between activities in the Advanced Planning and Optimization (APO) module has been exceeded. This error typically arises in the context of planning and scheduling processes, where the system is monitoring the time intervals between various activities or operations.Cause:
- Configuration Settings: The maximum time interval between activities is defined in the system settings. If the planned activities exceed this configured limit, the error will be triggered.
- Data Issues: Inconsistencies or errors in the master data (like production lead times, transportation times, etc.) can lead to unrealistic planning scenarios that exceed the allowed time intervals.
- Planning Parameters: Incorrect planning parameters or settings in the APO system can lead to scheduling conflicts or unrealistic time frames between activities.
Solution:
- Review Configuration: Check the configuration settings for the maximum time interval between activities. This can be done in the APO system under the relevant planning area settings. If necessary, adjust the maximum time interval to accommodate the planned activities.
- Analyze Master Data: Review the master data related to the activities in question. Ensure that lead times, transportation times, and other relevant parameters are correctly defined and realistic.
- Adjust Planning Parameters: If the planning parameters are too restrictive, consider adjusting them to allow for more flexibility in scheduling.
- Check Activity Sequences: Review the sequence of activities in the planning run. Ensure that the activities are logically sequenced and that there are no gaps that would lead to exceeding the maximum time interval.
- Run Planning Again: After making the necessary adjustments, re-run the planning process to see if the error persists.
Related Information:
/SAPAPO/AMON
to access alert monitoring or /SAPAPO/MC90
for planning book settings.By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/AMON_ALERTS013
Maximum time interval between orders not reached
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/AMON_ALERTS012
Minimum time interval between operations not reached
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/AMON_ALERTS015
Average resource overload
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/AMON_ALERTS016
Average resource underutilization
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.