Do you have any question about this error?
Message type: E = Error
Message class: /S4PPM/MCH -
Message number: 024
Message text: Project is locked by another user.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/S4PPM/MCH024
- Project is locked by another user. ?The SAP error message
/S4PPM/MCH024 Project is locked by another user
typically occurs in the context of project management within the SAP S/4HANA system, particularly when multiple users are trying to access or modify the same project simultaneously. Here’s a breakdown of the cause, potential solutions, and related information:Cause:
- Concurrent Access: The project is currently being edited or accessed by another user, which locks the project to prevent conflicting changes.
- Session Timeout: A user may have left a session open, causing the project to remain locked even if they are no longer actively working on it.
- System Errors: Occasionally, system errors or crashes can leave a project in a locked state.
Solution:
- Wait and Retry: If another user is actively working on the project, the simplest solution is to wait until they finish and release the lock.
- Check Lock Entries: Use transaction code
SM12
to check for lock entries. You can see which user has locked the project and potentially contact them to release the lock.- Release Locks: If you have the necessary authorizations, you can manually delete the lock entry in
SM12
. However, this should be done with caution and ideally after confirming with the user who has the lock.- Session Management: Ensure that users log out properly from their sessions to avoid leaving projects locked unintentionally.
- System Administration: If the issue persists, it may require intervention from your SAP Basis team to investigate and resolve any underlying system issues.
Related Information:
By following these steps, you should be able to resolve the locking issue and minimize its occurrence in the future.
Get instant SAP help. Start your 7-day free trial now.
/S4PPM/MCH023
Field &1 does not exist.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/S4PPM/MCH022
Project or work package field &1 does not exist.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/S4PPM/MCH025
Cannot update project because it already has a draft version.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/S4PPM/MCH026
Item could not be processed, please check it individually.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.