Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: S) -
Message number: 045
Message text: Enter S for shift or D for day as planning period
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
S)045
- Enter S for shift or D for day as planning period ?The SAP error message S)045 "Enter S for shift or D for day as planning period" typically occurs in the context of production planning or scheduling within SAP. This error indicates that the system expects the user to specify a planning period, but the input provided does not meet the required format.
Cause:
- Incorrect Input: The user may have entered an invalid character or left the field blank when the system expected either 'S' (for shift) or 'D' (for day).
- Field Configuration: The field may not be configured correctly in the system, leading to confusion about what inputs are acceptable.
- User Error: The user may not be aware of the required input format for the planning period.
Solution:
- Correct Input: Ensure that you enter either 'S' for shift or 'D' for day in the relevant field. Double-check for any typos or extra spaces.
- Field Validation: If you are sure you entered the correct value and still receive the error, check if there are any field validation rules or configurations that might be affecting the input.
- User Training: If this is a recurring issue, consider providing training or documentation to users to clarify the expected inputs for planning periods.
- System Configuration: If the issue persists, consult with your SAP administrator or technical team to review the configuration of the planning period field and ensure it is set up correctly.
Related Information:
If the problem continues after following these steps, it may be beneficial to reach out to SAP support for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
S)044
Switching modes not possible when schedule accessed externally
What causes this issue? You wanted to go from display to change mode, or vice versa.System Response The system issues an error message and will not ...
S)043
Please save your data in the higher-level application
What causes this issue? You wanted to save the sequence schedule.System Response The system issues an error message and will not allow you to contin...
S)046
No production version exists for line &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
S)047
No maximum production rate has been maintained for line &
What causes this issue? No maximum production rate (line hierarchy) exists for line &.System Response The system still compiles the sequence sch...
Click on this link to search all SAP messages.