Message type: E = Error
Message class: RU - Messages for order completion confirmation
Message number: 526
Message text: Line &: Total confirmed qty does not equal planned qty to be confirmed
This message could be given for the following reasons:
You enter a <ZH>final confirmation</>. The confirmed quantity for this
operation (yield + rework quantity + scrap quantitiy) is not equal to
the planned quantity to be confirmed.
You enter a <ZH>partial confirmation</>. The confirmed quantity to date
for this operation (yield + rework quantity + scrap quantity) is larger
than the planned quantity to be confirmed.
Error message extract from SAP system. Copyright SAP SE.
RU526
- Line &: Total confirmed qty does not equal planned qty to be confirmed ?The SAP error message RU526 ("Line &: Total confirmed qty does not equal planned qty to be confirmed") typically occurs in the context of production orders or confirmations in SAP. This error indicates that the total quantity of goods that have been confirmed does not match the planned quantity that was set for confirmation in the production order.
Cause: Mismatch in Quantities: The most common cause is that the total quantity confirmed (either through manual entry or system processing) does not equal the planned quantity for the production order. Partial Confirmations: If there are multiple confirmations for a single production order, the sum of these confirmations may not equal the planned quantity. Incorrect Data Entry: Manual entry errors during the confirmation process can lead to discrepancies. Changes in Production Order: If the production order was modified after some confirmations were made, it could lead to a mismatch. Batch Management: If batch management is enabled, issues with
Get instant SAP help. Sign up for our Free Essentials Plan.
RU525
Line &: Confirmed quantity is smaller than underdelivery tolerance
What causes this issue? You enter a final confirmation in line &V1&. The confirmed yield is smaller than the defined underdelivery tolerance ...
RU524
Confirmation &1 / &2 is already processed
What causes this issue? There are error records from the actual cost determination for confirmation &V1& with confirmation counter &V2&am...
RU527
Line &1: Preceding operation &2 has not been confirmed yet
What causes this issue? You want to confirm an operation in line &V1&. The preceeding operation is, however, not yet confirmed.System Respons...
RU528
Line &1: Only &2 for predecessor &3 / &4 has been confirmed
What causes this issue? &V2& has been confirmed as the yield, scrap and rework quantity for the preceding operation &V3& in order &am...
Click on this link to search all SAP messages.