Do you have any question about this error?
Message type: E = Error
Message class: RU - Messages for order completion confirmation
Message number: 216
Message text: Activity & element & does not require confirmation/is not open
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
RU216
- Activity & element & does not require confirmation/is not open ?The SAP error message RU216 ("Activity & element & does not require confirmation/is not open") typically occurs in the context of production order confirmations or when working with work centers and activities in SAP. This error indicates that the system is trying to confirm an activity or element that either does not require confirmation or is not currently open for confirmation.
Causes:
- Activity Status: The activity or element you are trying to confirm may not be in an open status. It could be completed or closed.
- Confirmation Requirement: The activity may be configured in such a way that it does not require confirmation. This can happen if the confirmation settings in the routing or work center are set to "no confirmation required."
- Incorrect Order Type: The order type you are working with may not support confirmations for the specific activity or element.
- Missing or Incorrect Data: There may be missing or incorrect data in the production order or work center that prevents the confirmation from being processed.
Solutions:
- Check Activity Status: Verify the status of the activity or element in the production order. Ensure that it is open and available for confirmation.
- Review Confirmation Settings: Check the routing and work center settings to see if the activity is set to require confirmation. If it is not, you may need to adjust the settings if confirmation is necessary.
- Order Type Validation: Ensure that the order type you are using allows for confirmations. If not, you may need to use a different order type or adjust the configuration.
- Data Verification: Review the production order and ensure that all necessary data is correctly entered. This includes checking for any missing components or settings that might affect the confirmation process.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on the configuration of activities and confirmations in your version of SAP.
Related Information:
If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and control.
Get instant SAP help. Start your 7-day free trial now.
RU215
Activity & does not require confirmation/is not open
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RU214
No (open) element found for activity &
What causes this issue? There are no elements to be confirmed for activity &V1&. Either the operation has no elements that can be confirmed o...
RU217
You have maintained the actual work - please enter a unit of measure
What causes this issue? You have not entered a unit for work in the activity.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ...
RU218
Actual work + remaining work deviates by more than &% from planned work
What causes this issue? The allowable deviation was exceeded when you made a completion confirmation for work.System Response INCLUDE 'NA_ALLG_...