Message class: RU - Messages for order completion confirmation
Message number: 209
Message text: Actual date(s) is in the future (check parameters)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
RU209
- Actual date(s) is in the future (check parameters) ?The SAP error message RU209, which states "Actual date(s) is in the future (check parameters)," typically occurs in the context of time management or project management within SAP. This error indicates that the system has detected that the actual date you are trying to enter or process is set in the future, which is not allowed for certain operations.
Cause:
- Future Dates: The most common cause of this error is that the date you are trying to enter (e.g., for time entries, project milestones, etc.) is beyond the current date.
- System Settings: There may be specific configurations or settings in the system that restrict the entry of future dates for certain transactions.
- Data Entry Error: It could also be a simple data entry mistake where the date was incorrectly inputted.
Solution:
- Check the Date: Verify the date you are trying to enter. Ensure that it is not set in the future. If it is, change it to a valid date that is either today or in the past.
- Review Parameters: If you are using a specific transaction or report, check the parameters you have set. Make sure that they align with the current date and do not include future dates.
- System Configuration: If you believe that future dates should be allowed for your specific use case, consult with your SAP administrator or technical team to review the system settings and configurations.
- User Training: Ensure that users are trained on the correct procedures for entering dates in the system to avoid future occurrences of this error.
Related Information:
If the issue persists after checking the above points, it may be beneficial to reach out to SAP support or your internal IT team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
RU208
Activity & element & not found in network &
What causes this issue? The activity and the activity element that you have entered for the completion confirmation do not exist in this network.Syst...
RU207
Activity & not found in network &
What causes this issue? The activity that you entered for the completion confirmation does not exist in this network.System Response INCLUDE 'N...
RU210
Work is confirmed - maintain the work center
What causes this issue? You have confirmed a value for work but no work center.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOK...
RU211
Enter either forecast finish or forecast duration
What causes this issue? You have entered a finish date <ZH>and</> a duration for the forecast completion confirmation. This is not possib...