Message type: E = Error
Message class: RU - Messages for order completion confirmation
Message number: 024
Message text: Preceding operation &1 of sequence &2 not yet confirmed
You want to confirm an operation. However, the preceding operation has
not yet been confirmed.
The system issues a message. The confirmation control parameters
determine the type of the message issued (for example, information
message or error message).
There are two options:
In the case of an error or termination message, you must first confirm
operation &V1& from sequence &V2& in order &V3&.
If you get any other type of message you can continue processing.
Error message extract from SAP system. Copyright SAP SE.
RU024
- Preceding operation &1 of sequence &2 not yet confirmed ?The SAP error message RU024 indicates that a preceding operation in a production order sequence has not yet been confirmed. This error typically occurs in the context of production planning and execution, particularly when dealing with production orders and their operations.
Cause:
The error arises when you attempt to confirm a subsequent operation in a production order without first confirming the preceding operation. In a production order, operations are often dependent on the completion of prior steps. If the system detects that the required preceding operation has not been confirmed, it will generate this error message.
Solution:
To resolve the RU024 error, follow these steps:
Check the Production Order: Review the production order in question to identify the sequence of operations. You can do this using transaction codes like CO03 (Display Production Order) or CO02 (Change Production Order).
Confirm the Preceding Operation: Locate the preceding operation that has not been confirmed. You can confirm it using transaction CO11N (Single Screen Confirmation) or CO15 (Collective Confirmation) depending on your needs.
Re-attempt Confirmation: After confirming the preceding operation, try to confirm the subsequent operation again. This should resolve the error.
Review Dependencies: Ensure that all dependencies and prerequisites for the operations are met. Sometimes, there may be additional conditions that need to be satisfied before an operation can be confirmed.
Check for Errors in the Order: If the preceding operation is confirmed but you still receive the error, check for any inconsistencies or errors in the production order itself.
Related Information:
By following these steps, you should be able to resolve the RU024 error and continue with your production processes.
Get instant SAP help. Sign up for our Free Essentials Plan.
RU023
Select an operation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RU022
Confirmation no. &1 does not correspond to sequence &2, check entry
What causes this issue? The confirmation number that you have entered does not correspond to the sequence that you have entered.How to fix this error...
RU025
Operation &1 of sequence &2 externally processed, confirm via goods rcpt
What causes this issue? You have tried to confirm an operation which, according to its control key, is processed externally. However, externally pro...
RU026
Operation &1 of sequence &2 cannot be confirmed
What causes this issue? You have tried to confirm an operation which, according to its control key, cannot be confirmed.How to fix this error? There...