Do you have any question about this error?
Message type: E = Error
Message class: RSR_PE - TREX Planning Engine
Message number: 054
Message text: InfoProvider &1, char. &2, separate implementation; cannot run in PAK
InfoProvider &1 contains characteristic &2 with a separate
implementation. This prevents the scenario from running as SAP
HANA-optimized with PAK.
As described in SAP Note 1637199, this characteristic makes the whole
scenario run using classic IP-based planning, rather than as SAP
HANA-optimized with PAK. The performance of planning actions like
executing sequences is the same as in classic BW-IP.
Remove characteristic &2 from your planning-enabled InfoProvider to run
the scenario as SAP HANA-optimized. If your characteristic references a
standard InfoObject from the technical content, contact SAP development
for more help. From 7.4 SP5 onwards, you also can try to remodel
InfoObjects using SAP HANA views. Implementations of this type are
supported in PAK.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
RSR_PE054
- InfoProvider &1, char. &2, separate implementation; cannot run in PAK ?The SAP error message RSR_PE054 typically indicates an issue related to the use of a characteristic in an InfoProvider that has a separate implementation, which is not compatible with the current execution context, particularly in the context of the Process Chain (PAK - Process Chain).
Cause:
- Separate Implementation: The characteristic mentioned in the error message has a separate implementation in the InfoProvider. This means that the characteristic is defined in a way that it cannot be processed in the current context (e.g., during a data load or query execution).
- Incompatibility: The specific characteristic may not be compatible with the data model or the way the InfoProvider is set up, leading to issues when trying to execute a query or load data.
- Process Chain Configuration: The process chain may not be configured correctly to handle the specific characteristics or InfoProviders involved.
Solution:
- Check Characteristic Implementation: Review the implementation of the characteristic in the InfoProvider. Ensure that it is correctly set up and that there are no conflicts with other characteristics or InfoProviders.
- Modify Process Chain: If the process chain is not configured to handle the separate implementation, you may need to adjust the process chain steps to accommodate the characteristic. This could involve changing the sequence of steps or adding additional steps to handle the data correctly.
- Data Source Compatibility: Ensure that the data source being used is compatible with the InfoProvider and the characteristics involved. You may need to adjust the data source or the InfoProvider settings.
- Consult Documentation: Refer to SAP documentation or notes related to the specific InfoProvider and characteristic to understand any known issues or additional configuration steps that may be required.
- Testing: After making changes, test the process chain to ensure that the error is resolved and that data is being processed correctly.
Related Information:
By following these steps, you should be able to diagnose and resolve the RSR_PE054 error in your SAP environment.
Get instant SAP help. Start your 7-day free trial now.
RSR_PE053
InfoProvider &1 with transient char. &2; cannot run scenario in PAK
What causes this issue? InfoProvider &1 with transient characteristic &2 prevents scenario from running as SAP HANA-optimized in PAK.System R...
RSR_PE052
InfoProvider &1 has ref. key figure &2; cannot run scenario in PAK
What causes this issue? InfoProvider &1 contains key figure &2 with references to another key figure. This prevents the whole scenario from r...
RSR_PE055
InfoProvider &1 contains data slice &2 and has no SQLScript procedure
What causes this issue? InfoProvider &1 contains data slice &2 of type "exit"<(>,<)> and there is no SQLScript-based im...
RSR_PE056
InfoProvider &1 with data slice &2; cannot run scenario in PAK
What causes this issue? InfoProvider &1 containing data slice &2 prevents the whole scenario from running as SAP HANA-optimized in PAK.System...