How To Fix RSM1163 - Reconstruction scheduled for data target &. Unable to start second run.


RSM1163 - Overview

  • Message type: E = Error

  • Message class: RSM1 - Messages for AWB, Scheduler and Monitor (new)

  • Message number: 163

  • Message text: Reconstruction scheduled for data target &. Unable to start second run.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RSM1163 - Reconstruction scheduled for data target &. Unable to start second run. ?
    The SAP error message RSM1163 indicates that a reconstruction process for a data target has been scheduled, but the system is unable to start a second run of the reconstruction. This typically occurs in the context of SAP BW (Business Warehouse) when there are issues with data loading or processing.
    
    Cause: Ongoing Process: The most common cause is that a previous reconstruction process is still running or has not completed. SAP BW does not allow multiple concurrent runs for the same data target to prevent data inconsistencies. Locking Issues: There may be locks on the data target that prevent the new reconstruction from starting. System Configuration: Configuration settings in the data target or process chain may restrict concurrent executions. Error in Previous Run: If the previous run encountered an error, it may not have released the lock on the data target.
    Solution: Check Running Processes: Use transaction codes like SM37 to check for any active jobs related

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant