How To Fix RSH_LEVELING021 - &1 operations could not be scheduled.


RSH_LEVELING021 - Overview

  • Message type: E = Error

  • Message class: RSH_LEVELING - Leveling Relevant Messages

  • Message number: 021

  • Message text: &1 operations could not be scheduled.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RSH_LEVELING021 - &1 operations could not be scheduled. ?
    The SAP error message RSH_LEVELING021 indicates that certain operations in a project or production order could not be scheduled due to various reasons. This error typically arises in the context of production planning and scheduling within SAP, particularly when using the Capacity Planning or Production Planning modules.
    Causes of RSH_LEVELING021
    
    
    Resource Availability: The resources (machines, labor, etc.) required for the operations may not be available during the planned time frame. This could be due to maintenance, overload, or other scheduling conflicts.
    
    
    Capacity Constraints: The capacity of the work centers may be insufficient to handle the planned operations, leading to scheduling issues.
    
    
    Incorrect Dates: The start or finish dates of the operations may be set incorrectly, causing conflicts with other scheduled operations.
    
    
    Missing Master Data: Required master data such as work centers, routing, or production versions may be incomplete or incorrect.
    
    
    Dependencies and Predecessors: There may be dependencies or predecessor relationships that are not satisfied, preventing the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author