How To Fix RSH_LEVELING020 - As many of the selected operations as possible were scheduled.


RSH_LEVELING020 - Overview

  • Message type: E = Error

  • Message class: RSH_LEVELING - Leveling Relevant Messages

  • Message number: 020

  • Message text: As many of the selected operations as possible were scheduled.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RSH_LEVELING020 - As many of the selected operations as possible were scheduled. ?
    The SAP error message RSH_LEVELING020 indicates that during the scheduling process, the system was unable to schedule all selected operations due to constraints such as resource availability, capacity limits, or other scheduling conflicts. This message typically arises in the context of production planning and scheduling within SAP, particularly when using the SAP Advanced Planning and Optimization (APO) module or similar functionalities.
    
    Cause: Resource Constraints: The resources (machines, labor, etc.) required for the operations may not be available at the scheduled time. Capacity Limits: The capacity of the resources may be exceeded, preventing the scheduling of all operations. Conflicting Operations: There may be overlapping operations that cannot be scheduled simultaneously due to dependencies or resource allocation. Incorrect Master Data: Issues with master data, such as incorrect lead times, operation sequences, or resource definitions, can lead to scheduling problems. Scheduling Parameters: The parameters set for scheduling (like time buffers, priority settings, etc.) may not allow for all operations

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant