How To Fix RPM_DATA_CONSISTNECY007 - Planned finish of role exceeds project &1 finish &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RPM_DATA_CONSISTNECY - Consistency messages for date and content checks

  • Message number: 007

  • Message text: Planned finish of role exceeds project &1 finish &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_DATA_CONSISTNECY007 - Planned finish of role exceeds project &1 finish &2 ?

    The SAP error message RPM_DATA_CONSISTENCY007 indicates that there is a data consistency issue related to the planned finish date of a role in a project. Specifically, the error states that the planned finish date of a role exceeds the overall finish date of the project. This inconsistency can lead to issues in project planning and resource allocation.

    Cause:

    The error is typically caused by one of the following scenarios:

    1. Role Planning Error: The planned finish date for a specific role or resource is set beyond the overall finish date of the project.
    2. Project Date Configuration: The project’s finish date may have been updated or changed, but the role's planned finish date was not adjusted accordingly.
    3. Data Entry Mistake: There may have been a manual entry error when setting the dates for the role or project.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Role Dates:

      • Navigate to the project in question and review the planned finish dates for all roles.
      • Ensure that the planned finish date for each role does not exceed the project’s overall finish date.
    2. Adjust Dates:

      • If you find that the role's planned finish date exceeds the project finish date, adjust the role's planned finish date to be on or before the project finish date.
    3. Review Project Dates:

      • Check the overall project finish date to ensure it is set correctly. If necessary, update the project finish date to reflect the correct timeline.
    4. Consistency Check:

      • After making adjustments, run a consistency check in the project management module to ensure that all dates are aligned and there are no further inconsistencies.
    5. Consult Documentation:

      • If you are unsure about the changes, consult the SAP documentation or your project management guidelines to ensure compliance with project planning standards.
    6. Seek Help:

      • If the issue persists or if you are unable to resolve it, consider reaching out to your SAP support team or a consultant who specializes in SAP project management.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance.
    • Project Management Best Practices: Familiarize yourself with best practices in project management within SAP to avoid similar issues in the future.
    • Training: Consider training sessions for team members involved in project planning to minimize data entry errors.

    By following these steps, you should be able to resolve the RPM_DATA_CONSISTENCY007 error and ensure that your project planning data is consistent and accurate.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author