How To Fix RPM_DATA_CONSISTNECY005 - Role dates &1 &2 are not within the range of the project start and finish


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RPM_DATA_CONSISTNECY - Consistency messages for date and content checks

  • Message number: 005

  • Message text: Role dates &1 &2 are not within the range of the project start and finish

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RPM_DATA_CONSISTNECY005 - Role dates &1 &2 are not within the range of the project start and finish ?

    The SAP error message RPM_DATA_CONSISTENCY005 indicates that there is a discrepancy between the role dates assigned to a resource and the overall project start and finish dates. Specifically, it means that the dates for a role (from &1 to &2) are not falling within the defined project timeline.

    Cause:

    1. Role Date Mismatch: The dates assigned to a specific role for a resource are outside the project's defined start and finish dates.
    2. Project Date Configuration: The project may have been configured with specific start and end dates that do not align with the role dates.
    3. Data Entry Error: There may have been an error during data entry, leading to incorrect role dates being assigned.

    Solution:

    1. Check Project Dates: Verify the start and finish dates of the project. You can do this by navigating to the project in the SAP system and checking the project details.
    2. Adjust Role Dates: If the role dates are incorrect, update them to ensure they fall within the project start and finish dates. This can be done in the resource assignment or role assignment section of the project.
    3. Re-evaluate Role Assignments: If the role is not needed for the entire duration of the project, consider adjusting the role assignment to reflect only the necessary dates.
    4. Consult Documentation: Review any project documentation or guidelines to ensure that the role dates are set according to project requirements.
    5. System Configuration: If the issue persists, it may be necessary to check the system configuration or consult with an SAP administrator to ensure that there are no underlying issues with project date settings.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like CJ20N (Project Builder) or CJ02 (Change Project) to view and edit project details.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance.
    • User Roles and Permissions: Ensure that you have the necessary permissions to make changes to project and role assignments.
    • Testing Changes: After making adjustments, it’s advisable to test the changes in a development or test environment before applying them to the production environment.

    By following these steps, you should be able to resolve the RPM_DATA_CONSISTENCY005 error and ensure that role dates align correctly with the project timeline.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker