How To Fix RMXTPP098 - At least one resource does not match PP control parameters in plant &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RMXTPP - TMS-PP: Messages for PP Component

  • Message number: 098

  • Message text: At least one resource does not match PP control parameters in plant &1

  • Show details Hide details
  • What causes this issue?

    One or more of the selected resources do not match the settings in
    the PP control parameters. They are deleted from the selection.

    System Response

    Only resources whose resource category matches the configured PP control
    parameters and which exist in the relevant plant are considered by the
    system.

    How to fix this error?

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RMXTPP098 - At least one resource does not match PP control parameters in plant &1 ?

    The SAP error message RMXTPP098 indicates that there is a mismatch between the resource parameters defined in the system and the production planning (PP) control parameters for a specific plant. This error typically arises during the planning or scheduling processes in SAP, particularly when using the SAP Advanced Planning and Optimization (APO) module or the Production Planning module.

    Cause:

    The error can be caused by several factors, including:

    1. Resource Configuration: The resource (e.g., machine, labor) may not be configured correctly in the system. This includes parameters such as capacity, availability, or specific control parameters that are not aligned with the requirements of the production process.

    2. Control Parameters: The PP control parameters set for the plant may not match the characteristics of the resources assigned to the production orders or planning scenarios.

    3. Master Data Issues: There may be inconsistencies in the master data related to the resources, such as incorrect or missing data in the resource master records.

    4. Planning Version: The planning version being used may not be compatible with the resource settings.

    Solution:

    To resolve the RMXTPP098 error, you can take the following steps:

    1. Check Resource Configuration:

      • Go to the resource master data and verify that all necessary parameters are correctly defined.
      • Ensure that the resource is active and available for the relevant planning period.
    2. Review PP Control Parameters:

      • Check the PP control parameters for the plant in question. Ensure that they are set correctly and align with the resource capabilities.
      • You can access these settings in the configuration settings for the production planning module.
    3. Validate Master Data:

      • Review the master data for the resources involved in the production process. Ensure that all required fields are filled out correctly and that there are no discrepancies.
    4. Check Planning Version:

      • Ensure that the planning version you are using is appropriate for the resources and that it is set up correctly in the system.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for specific details on the error message and additional troubleshooting steps.
    6. Testing:

      • After making the necessary adjustments, run a test planning run to see if the error persists.
    7. Seek Support:

      • If the issue continues, consider reaching out to your SAP support team or consulting with an SAP expert who can provide more tailored assistance based on your specific configuration and setup.

    Related Information:

    • Transaction Codes: You may need to use transaction codes such as CR01 (Create Resource), CR02 (Change Resource), or CR03 (Display Resource) to manage resource data.
    • SAP Notes: Check for any relevant SAP Notes that may address known issues related to this error message.
    • Documentation: Review the SAP Help Portal for detailed information on production planning and resource management.

    By following these steps, you should be able to identify and resolve the cause of the RMXTPP098 error in your SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant