Message type: E = Error
Message class: RMXTPP - TMS-PP: Messages for PP Component
Message number: 060
Message text: &1 is not a workday in plant &2; forward sched. used for production start
The production start for the trial was planned for calendar day &V1&
, which, according to the configuration in the factory calendar
for plant &V2&, is not a workday.
The production start is scheduled for the next possible workday.
If necessary, change the configuration of the factory calendar for the
plant.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
RMXTPP060
- &1 is not a workday in plant &2; forward sched. used for production start ?The SAP error message RMXTPP060 indicates that the system has encountered an issue with scheduling in the context of production planning. Specifically, the error states that a certain date (denoted as &1) is not recognized as a valid workday in the specified plant (denoted as &2). This typically occurs when the scheduling logic is trying to plan production on a date that is not a working day according to the plant's calendar.
Cause:
- Non-Working Day: The date being referenced is a weekend or a holiday that is not defined as a working day in the plant's calendar.
- Incorrect Factory Calendar: The factory calendar assigned to the plant may not be set up correctly, or it may not include the date in question as a working day.
- Production Scheduling Settings: The production scheduling settings may not align with the actual working days defined in the system.
Solution:
- Check the Date: Verify the date (&1) mentioned in the error message. Ensure that it is indeed a working day according to the plant's calendar.
- Review Plant Calendar:
- Go to the transaction code
SCAL
(Maintain Calendar) to check the factory calendar assigned to the plant.- Ensure that the date in question is marked as a working day.
- Adjust Production Schedule: If the date is not a working day, adjust the production schedule to start on the next available working day.
- Update Factory Calendar: If necessary, update the factory calendar to include additional working days or adjust holiday settings.
- Check Configuration: Review the configuration settings for production scheduling to ensure they are aligned with the plant's operational calendar.
Related Information:
SCAL
: To maintain and view factory calendars.MD01
: To run MRP (Material Requirements Planning) and check scheduling.By following these steps, you should be able to resolve the RMXTPP060 error and ensure that production scheduling aligns with the defined working days in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
RMXTPP059
PP control parameters are not available for plant &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RMXTPP058
Internal error while selecting the trial data
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RMXTPP061
Choose a trial
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...