Message type: E = Error
Message class: RMXTPP - TMS-PP: Messages for PP Component
Message number: 059
Message text: PP control parameters are not available for plant &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
RMXTPP059
- PP control parameters are not available for plant &1 ?The SAP error message RMXTPP059 indicates that the production planning (PP) control parameters are not available for a specific plant. This error typically arises when the system is unable to find the necessary configuration or master data related to production planning for the specified plant.
Cause: Missing Configuration: The PP control parameters for the plant have not been set up in the system. Incorrect Plant Assignment: The plant may not be correctly assigned to the relevant production planning settings. Master Data Issues: There may be missing or incomplete master data, such as material master records or work center definitions. Transport Issues: If the configuration was recently transported from another system, it may not have been transported correctly.
Solution: Check Configuration: Go to the SPRO transaction and navigate to the relevant configuration settings for Production Planning. Ensure that the PP control parameters are defined for the specific plant in question. Verify Plant Assignment: Check if the plant is correctly assigned to the
Get instant SAP help. Sign up for our Free Essentials Plan.
RMXTPP058
Internal error while selecting the trial data
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RMXTPP057
Trial-type-independent PP control parameters not available for plant &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RMXTPP060
&1 is not a workday in plant &2; forward sched. used for production start
What causes this issue? The production start for the trial was planned for calendar day &V1& , which, according to the configuration in the f...
RMXTPP061
Choose a trial
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.