How To Fix RM718 - Programming error. PBT environment has already been initialized


RM718 - Overview

  • Message type: E = Error

  • Message class: RM - Messages for Repetitive Manufacturing

  • Message number: 718

  • Message text: Programming error. PBT environment has already been initialized

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


RM718 - Details

  • The SAP error message RM718, which states "Programming error. PBT environment has already been initialized," typically occurs in the context of the SAP Profitability Analysis (CO-PA) module or when dealing with Profitability-Based Transfer Pricing (PBT). This error indicates that there is an issue with the initialization of the PBT environment, which is expected to be initialized only once during a session or transaction.
    Causes:
    
    Multiple Initializations: The error usually arises when there is an attempt to initialize the PBT environment more than once in the same session or transaction.
    Incorrect Program Logic: There may be a flaw in the custom code or program logic that leads to the re-initialization of the PBT environment.
    Session Management Issues: Problems with session management or transaction handling in the ABAP code can lead to this error.
    
    Configuration Issues: Incorrect configuration settings in the PBT setup may also lead to this error. Solutions: Check Initialization Logic: Review the code to ensure that

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


RM718 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant