Do you have any question about this error?
Message type: E = Error
Message class: RM - Messages for Repetitive Manufacturing
Message number: 217
Message text: Activity posting cancelled
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
RM217
- Activity posting cancelled ?The SAP error message RM217, which states "Activity posting cancelled," typically occurs during the posting of activity allocations in SAP. This error can arise due to various reasons, and understanding the cause is essential for resolving the issue. Here are some common causes, potential solutions, and related information:
Causes:
- Missing or Incorrect Master Data: The error may occur if the master data (such as cost centers, internal orders, or activity types) is incomplete or incorrectly configured.
- Authorization Issues: The user may not have the necessary authorizations to perform the activity posting.
- Incorrect Configuration: Issues in the configuration of the controlling module (CO) or the activity allocation process can lead to this error.
- Posting Period Issues: The posting period may be closed, preventing any further postings.
- Data Consistency Issues: There may be inconsistencies in the data being posted, such as mismatched units of measure or incorrect account assignments.
Solutions:
- Check Master Data: Verify that all relevant master data is correctly set up and active. Ensure that cost centers, internal orders, and activity types are correctly defined and assigned.
- Review Authorizations: Ensure that the user has the necessary authorizations to perform the activity posting. This can be checked in the user roles and profiles.
- Configuration Review: Review the configuration settings in the controlling module to ensure that they are set up correctly for activity allocations.
- Open Posting Period: Check the posting period settings in the system. If the period is closed, you may need to open it or post in a different period.
- Data Validation: Validate the data being posted for any inconsistencies. Check for correct account assignments, units of measure, and any other relevant data fields.
- Transaction Logs: Review transaction logs or error logs for more detailed information about the error. This can provide insights into what specifically caused the cancellation.
Related Information:
KP26
(Activity Type Planning), KSU5
(Actual Activity Allocation), and KSB1
(Cost Centers: Actual Line Items) to analyze and troubleshoot the issue.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
RM216
Partial GI posted with document & and activities
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RM215
GI posted with document & and activities
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RM218
Neither material movement nor activity posting was reversed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RM219
Collective postprocessing carried out for all items
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.