Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: RM - Messages for Repetitive Manufacturing
Message number: 126
Message text: Yield confirmed too large
You want to backflush a yield which exceesds the quantity backflushed
at the last reporting point.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check your entries. If necessary, backflush the quantities at the
previous reporting points.
Error message extract from SAP system. Copyright SAP SE.
RM126
- Yield confirmed too large ?The SAP error message RM126, which states "Yield confirmed too large," typically occurs in the context of production order confirmations in SAP. This error indicates that the yield (the amount of product produced) that is being confirmed exceeds the expected yield defined in the production order.
Causes:
- Excessive Yield Confirmation: The yield being confirmed is greater than the planned yield for the production order.
- Incorrect Production Order Data: The production order may have incorrect data regarding the expected yield or the quantity of materials used.
- System Configuration Issues: There may be issues with the configuration of the production process or the settings in the material master data.
- Data Entry Errors: Manual entry errors during the confirmation process can lead to incorrect yield values being input.
Solutions:
- Review Production Order: Check the production order to ensure that the planned yield is correct. If the yield is indeed higher than expected, you may need to adjust the production order or the yield confirmation.
- Adjust Yield Confirmation: If the yield being confirmed is incorrect, adjust the confirmation to reflect the actual yield produced.
- Check Material Master Data: Ensure that the material master data is correctly configured, particularly the production-related views that may affect yield calculations.
- Consult with Production Planning: If the yield consistently exceeds expectations, consult with the production planning team to understand if there are changes in the production process or if the expected yield needs to be updated.
- System Configuration Review: If the issue persists, it may be necessary to review the system configuration related to production orders and yield confirmations to ensure everything is set up correctly.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to engage with your SAP support team or consult SAP's support portal for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
RM125
No planned orders available for sales order. BOM is exploded
What causes this issue? No planned orders exist for the sales order. The explosion is not carried out using a planned order but using the current BOM...
RM124
Confirm. qty > plnd order qty (There will be overdelivery for pl. order)
What causes this issue? The backflush quantity is greater than the planned order quantity for the sales order. Even if several planned orders exist f...
RM127
Scrap quantity confirmed too large
What causes this issue? You want to backflush a scrap quantity that exceeds the yield backflushed at the last reporting point.System Response The sy...
RM128
Planned order &1 not allowed for make-to-order production
What causes this issue? You want to carry out a backflush for a planned order. The planned order you entered is not allowed for make-to-order product...
Click on this link to search all SAP messages.