Do you have any question about this error?
Message type: E = Error
Message class: RM - Messages for Repetitive Manufacturing
Message number: 125
Message text: No planned orders available for sales order. BOM is exploded
No planned orders exist for the sales order. The explosion is not
carried out using a planned order but using the current BOM.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
RM125
- No planned orders available for sales order. BOM is exploded ?The SAP error message RM125 ("No planned orders available for sales order. BOM is exploded") typically occurs in the context of production planning and sales order processing. This message indicates that the system could not find any planned orders that can be used to fulfill the sales order, even though the Bill of Materials (BOM) has been exploded.
Causes:
- No Planned Orders Created: There may not be any planned orders created for the materials required to fulfill the sales order.
- Incorrect MRP Settings: The Material Requirements Planning (MRP) settings may not be configured correctly, leading to no planned orders being generated.
- BOM Issues: There could be issues with the BOM, such as missing components or incorrect validity dates.
- Sales Order Not Firmed: The sales order may not be firmed, which can prevent the system from generating planned orders.
- Capacity Constraints: There may be capacity constraints in the production planning that prevent the creation of planned orders.
- Material Availability: The materials required for the sales order may not be available in stock, leading to no planned orders being created.
Solutions:
- Check Planned Orders: Verify if any planned orders exist for the materials required by the sales order. You can do this using transaction codes like MD04 (Stock/Requirements List) or MD03 (Display MRP List).
- Run MRP: If no planned orders exist, run the MRP process (transaction code MD01 or MD02) to generate planned orders for the materials.
- Review BOM: Check the BOM for the finished product to ensure that all components are correctly defined and valid. Use transaction code CS03 to display the BOM.
- Firm the Sales Order: If the sales order is not firmed, consider firming it to allow the system to generate planned orders.
- Check MRP Settings: Review the MRP settings for the material in question to ensure they are set up correctly. This includes checking the MRP type, lot size, and planning parameters.
- Check Capacity Planning: Review the capacity planning to ensure that there are no constraints that would prevent the creation of planned orders.
- Material Availability Check: Ensure that the required materials are available in stock or can be procured in time to fulfill the sales order.
Related Information:
By following these steps and understanding the underlying causes, you should be able to resolve the RM125 error and ensure that planned orders are available for your sales orders.
Get instant SAP help. Start your 7-day free trial now.
RM124
Confirm. qty > plnd order qty (There will be overdelivery for pl. order)
What causes this issue? The backflush quantity is greater than the planned order quantity for the sales order. Even if several planned orders exist f...
RM123
No postprocessing records exist for these selection criteria
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
RM126
Yield confirmed too large
What causes this issue? You want to backflush a yield which exceesds the quantity backflushed at the last reporting point.System Response The system...
RM127
Scrap quantity confirmed too large
What causes this issue? You want to backflush a scrap quantity that exceeds the yield backflushed at the last reporting point.System Response The sy...
Click on this link to search all SAP messages.