How To Fix RI016 - Entry required for project, WBS element, order, or network


RI016 - Overview

  • Message type: E = Error

  • Message class: RI - Projects: commercial reporting

  • Message number: 016

  • Message text: Entry required for project, WBS element, order, or network

  • Show details Hide details
  • What causes this issue?

    An entry is required.

    How to fix this error?

    Enter one of the following objects:
    Project, WBS element, order, or network. Only one entry is allowed.

    Error message extract from SAP system. Copyright SAP SE.


RI016 - Details

  • The SAP error message RI016 ("Entry required for project, WBS element, order, or network") typically occurs when you are trying to post a transaction that requires a reference to a project, Work Breakdown Structure (WBS) element, order, or network, but that reference is missing or not properly specified.
    
    Cause: Missing Reference: The transaction you are trying to execute requires a project, WBS element, order, or network number, but you have not provided one. Incorrect Configuration: The system may not be configured correctly to recognize the project or WBS element you are trying to use. Authorization Issues: You may not have the necessary authorizations to access the project or WBS element. Data Entry Error: There may be a typographical error in the project or WBS element number you entered.
    Solution: Check Input Fields: Ensure that you have entered a valid project, WBS element, order, or network number in the relevant fields of the transaction. Verify Existence: Confirm that the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


RI016 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant